Featured Project

Waller ISD Renovation

Roberts Road Elementary School

Waller, Texas

2025
Completed
1
Service
Project Overview

Waller ISD Renovation

Texan Floor Service (TFS) completed a comprehensive flooring installation for Roberts Road Elementary in Waller ISD on September 20, 2025. The project delivered high-performance, durable flooring systems across the campus, engineered to withstand the continuous daily demands of an active K–12 educational environment while creating a clean, vibrant, and cohesive aesthetic. The multi-material installation spanned classrooms, corridors, administrative offices, restrooms, and shared common areas. TFS executed a strategic flooring plan incorporating heavy-duty carpet for noise reduction in instructional spaces, low-maintenance tile in high-traffic hallways, hygienic epoxy coating systems in restrooms and utility zones, and specialized impact-absorbing athletic flooring in physical education areas. Through thorough subfloor preparation and expert transition execution, TFS delivered a reliable, safety-focused, and future-ready campus environment on schedule for Waller ISD.

Project Details

SCOPE OF WORK & MATERIAL APPLICATION: - Classrooms & Administrative Offices: High-durability commercial carpet and modular carpet tile chosen for acoustic dampening, stain resistance, and underfoot comfort. - Hallways & Corridors: Commercial-grade tile (VCT/LVT) engineered for heavy foot traffic, rolling cart loads, and streamlined daily cleaning. - Gymnasium & Activity Spaces: Impact-absorbing, high-performance athletic flooring designed for student safety, traction, and multi-use activity. - Restrooms & Utility Zones: Seamless, non-porous epoxy coating systems providing complete moisture resistance, hygienic protection, and easy sanitization. - Subfloor Preparation: Full concrete substrate leveling, moisture testing, and patching across all campus zones prior to installation. KEY PERFORMANCE HIGHLIGHTS: - Multi-Material Transition Detailing: Precise edge matching and smooth transitions between disparate flooring types (carpet, tile, epoxy, athletic surfaces). - K–12 Safety & Acoustic Standards: Materials selected specifically to reduce hallway noise reverberation and meet strict anti-slip safety guidelines. - On-Schedule Delivery: Completed on September 20, 2025, adhering strictly to district timeline requirements with zero impact on campus operations.

Scope of Work

Classrooms

hallways

offices

restrooms

common areas

epoxy flooring systems

carpet installation

tile installation

Project Information

Client

Roberts Road Elementary School

Location

Waller, Texas

Completed

September 20, 2025

Ready to Start Your Enterprise-Scale Project?

TFS handles the largest commercial flooring projects in Houston. From convention centers like the George R. Brown Convention Center to major distribution centers—we deliver complete solutions for enterprise-scale operations.

Let's discuss how we can optimize your facility's flooring for maximum performance and operational efficiency.

38+
Years Experience
500+
Projects Completed
100%
Employee-Owned
24/7
Support Available