Direct answer: Coordinating large-scale flooring is less about “more installers” and more about early agreement on phasing, substrate readiness, material lead times, and how flooring hands off to other trades—especially when buildings stay occupied. Miss those interfaces and flooring becomes the trade that slips the critical path.
Use this guide alongside TFS’s GC process page and the project portfolio / case studies. For safety program context (detailed metrics on request), see Safety.
- Timeline coordination
- Trade coordination
- Quality standards
- Communication protocols
- Problem resolution